Technological Flow of Production of Aerated Concrete
Product Category:Aerated concrete equipment
Product Name :Technological Flow of Production of Aerated Concrete
Browse:1465Date:2008-9-5 14:07:35
Technological Flow of Production of Aerated Concrete
First of all, dose and measure the stored raw mater ials (1) and
then feed them into pouring mixer and mixing (2) pour them evenly
(3) precuring in the mould (steel bars for slabs(19).at fixed
temperature and time (4) after the blank reach certian kind of
hardness.It shall be processed by the tilting hanger to fulfil
following actionsa. overturn the mould for 90 angle (5) (one side
of the mould become the bottomto to support the blank until it
become the finished products): b. hanged to the cart or support
flame to demould (6) mould flame and hardening side blank shall be
ready for next pouring after cleaning and oil spraying(17)(18). The
blank then be cutted in six sides on the cutting machinerya.first,
vertical cutting the two vertical sides of the blank (7):b then do
Vertical level-cutting(8):c.finally do horizontal vertical
cutting(9).the cutted blank and the bottom are hanged by the
semiproduct hanger to the hardening car(10),and are fed into the
autoclave after grouped to be hardened under high temperature
(11)(12).after that, the end product leaves the autoclave(13) and
is hanged by the finished product hanger to be stacked or losded
(14) and packed (15).the hardening plates are returned(16).